Program Outline:
No Payment Required to join the first session!
Week 1 -
Week 2 -
- Navigate, understand and apply CEC conductor ampacity tables to various scenarios
- Free Air installations
- In Raceway or Cables
- Overhead installations
- Underground installations
- Apply Correction Factors
- Temperature
- Raceway Fill
- Groupings
- Tray installations
- Week 2 Practice Quiz 2
Week 3 -
- Correctly apply the "Tap Rule" 14-100
- Conditions of use
- Types of taps covered by the rule
- Apply 14-100 to size conductors
- Apply 14-100 to size over current protection
- Apply 14-100 to size disconnects
- Review scenarios of how to apply the tap rule
- Continuous and Non-Continuous Loads
- Apply rule 8-104 to sizing overcurrent devices
- Apply rule 8-104 to sizing conductors
- "De-rating" or calculating overcurrent device requirements as they apply to this rule
- Calculating load requirements as it relates to Continuous and Non-continuous rated equipment
- Week 3 Practice Quiz 3
Week 4 -
- Demand Factor Calculations for:
- Single Dwellings
- Apartments and Similar Dwellings
- Schools
- Hospitals
- Hotels, Motels, Dormitorys and buildings of similar occupancy
- Other types of occupancy (Apply 8-210 & T14)
- Heating and AC demand Calculations (Apply rules from Sec.8 & Sec.62)
- Week 4 Practice Quiz 4
Week 5 -
- Services (Sec.6)
- Metering systems
- 1 ph, 2-wire
- 1 ph, 3-wire
- 3 ph, 3-wire
- 3 ph, 4-wire
- Instrument rated metering (CT & PT)
- Grounding and Bonding (Sec.10)
- Solidly Grounded Systems
- Ungrounded Systems
- Impedance Grounded Systems
- System Bonding Jumper applications
- Raceway bonding for service equipment
- Week 5 Practice Quiz 5